To ensure that detailed designs broadly follow the concept designs, provide continuity between the two geographical areas, specify high quality construction, whilst promoting innovative, imaginative and cost effective aims, a Design Steering Group (DSG) is proposed. It is intended that the DSG would include representatives from, the concept design teams The Landscape Partnership and WS Atkins, representatives from WDC and SCC, and as appropriate, representatives from EEDA and CABE.

The DSG will be directly responsible for recommending a range of design themes and material specifications that should be applied to projects in both concept areas. The recommendations will also specify which aspects of the scheme as a whole the themes and specifications are to apply to. A carefully considered balance is required between providing continuity across the scheme and the promotion of innovative and imaginative designs crafted to enhance specific areas of the scheme.

All project designs will be submitted to the DSG for initial Concept Appraisal, designs will go to the appraisal team within whose geographical area they fall. The proposed designs, together with the appraisal teams recommendations, will then pass to the full steering group for consideration and recommendations to the Management Group. The DSG is not intended as a decision-maker, the Management Group will make final design decisions. However it is expected that most decisions will be a ratification of the DSG recommendations.

A joint presentation from the concept designers has been arranged. The purpose of the presentation is to show how they could work within or develop the DSG proposed framework to effectively manage the design element of the scheme, as a whole and for individual projects

 